NET1Plus Ops and Admins spent most of the week performing routine data center maintenance work. A majority of the work performed was a continuation of the migration of servers and equipment from the legacy racks to the fully managed APC Infrastructure racks. This work also included the removal of cabling, ACLs, VLANs, and routing that were no longer required.
This coming week NET1Plus Ops and Admins will be increasing the capacity of our core switching infrastructure in the Leominster Data Center.
Data Center and Network Up Time from 9/19/08 5PM to 9/26/08 5PM was 100%.
There were no unexpected NET1Plus Production server outages for the same period.